Big "Groovy " track

                       

                                wpe1.jpg (121345 bytes)

Want to build a grand scale railroad? Here's how we built our 15" gauge "Groovy" track! As with our smaller "Groovy" track, this is a way to build a high quality railroad for a fraction of the cost of some other forms of trackage. As with the smaller stuff, the Big stuff is laid using notched ties and steel flat bar. Everything is just much bigger and heavier.

                              wpeA.jpg (118809 bytes)

Over the next few months we will feature photos and other info on our 15" gauge railroad which we built for our park. Please keep in mind...We don't sell this stuff. We offer the ideas to be used as you wish. Why do we use this track system? Because it is within our track budget. Our cost including ties, rail and ballast averages $5.00/foot. Take a look at the cost of  12 lb or heavier rail   and associated hardware. It should also be understood that regular rail must be pre-bent for tight radius curves whereas the flat bar can be bent easily without special tools or hassle.

                          wpeB.jpg (181901 bytes)

 

                                        wpeC.jpg (189997 bytes)

wpe9.jpg (157625 bytes) Here's a great way to splice the rail. It's a nice alternative to all that drilling. Shown here is 1/2 inch schedule 40 pipe with 5/8 Inch cold rolled round bar for a pin. A little oil on the joint keeps loose for movement during expansion and contraction of the track.

 

 

                        Stay tuned for further info on the Big "Groovy" track system!

 

 

 

 

 

 

 

 

                                         Hit Counter